Overview
What's inside: A "Now/Next/Later" roadmap and a build sequence based on technical dependencies.
We audit your feature list, identify the foundation feature, and sequence your build into a clear Now/Next/Later roadmap.
Outcome
Break the Cycle of Paralysis: Stop wondering which of your 20 features to start first. We identify the "Foundation Feature" - the one piece of logic everything else relies on.
Build by Dependency, Not Hype: We organize your project based on what the architecture needs first, ensuring you don't build a search bar before you have a database to search.
Stay in a "Shippable" State: Move from building 30% of everything simultaneously to shipping 100% of one function at a time. Each phase of your build remains deployable and functional.
Audience
Applications
Identify the "Must-Haves" to get a working version in front of users or investors in weeks, not months. Iteration is easier once you’re live.
Ensure your data flow is logical from Day 1. Building by dependency keeps your code modular, dry, and easy to scale.
Recruiters want to see a working URL. It is better to show 3 fully functional features than 10 broken ones. This ensures you ship the 3 that matter.
Methodology
Next Steps
Quick Info
Process
Step 1: Dependency Analysis. We audit your features to find the technical "anchor." This is the core logic (like a listing system or tracking function) that must exist before anything else works.
Step 2: Strategic Sequencing. We stack features in an order that minimizes rework. You build in layers: Database tables first, then backend logic, then the frontend that calls it.
Step 3: MVP Extraction. We define the leanest version of your app ready for AWS. Phase 1 is your launch; everything else is moved to Phase 2, Phase 3, or the backlog.
Deliverables
You walk away with a clear build order that removes development paralysis. By identifying your Foundation Feature first, you ensure your architecture stays clean and you avoid the "re-write trap." You will always know what to work on today, what is coming next, and exactly when your project is ready for a live URL. You aren’t just building; you are executing a professional development roadmap.
Prerequisites
Cost
3 credits
Time
30-40 minutes
Requirement
A list of features you want in your final app (rough notes are fine).